ForgeDocs

P6 planning: information architecture (design pass, 2026-10-31)

Status: unshipped design input; see README for caveats and the synthetic-data note.

Scope: Work › Planning for agents and humans. Jira-lite, GitHub Issues parity, built for many agents plus people. Status is read from Forge's own records, never typed by hand. Nothing in the user UI shows money.

1. Item model

One record kind, Item, with a light hierarchy and labels instead of a type tree.

FieldRequiredNotes
id, version, operationIdyesAs today (planningItemSchema). Every write is CAS on expectedVersion; same operationId replays.
kindyesinitiative or item (wire name stays issue for compatibility).
titleyesThe only required field for capture. Outcome-first, ≤ 90 chars recommended, never truncated in UI.
bodynoPlain text with light Markdown (paragraphs, lists, links, code). Convention, not schema: why, done when, scope, links.
typenoOne label from the project's type list (defaults: feature, bug, friction, decision, idea, chore, docs). Free to add; max 12 per project.
initiativeIdnoParent Initiative. An Item with none sits under "No Initiative".
parentIdnoParent Item → this is a sub-item. Depth is exactly Initiative › Item › sub-item; a sub-item cannot have children (server refuses).
orderyesFractional rank string (LexoRank-style) among siblings (same initiativeId and parentId). Server assigns "end of list" on create.
notBeforenoISO date. Until that day the Item is Dated: alive but out of "to tackle". Replaces calendar waits tracked by hand.
fieldsnoRecord<string, string>; keys from the project's field list (max 6 fields, e.g. area, stage). Values are short text; no typed schema in v1.
status (declared)yesopen, closed, abandoned (+ legacy proposed, in-progress read as open). Declared status is the floor; the derived status (below) is what the UI shows.
reasonon close/abandonFree text. "Closed by hand" needs one; landing-closed Items carry evidence instead.
intentIdsnoLinks to Intents. Many-to-many: one Lane can serve two Items (two frictions fixed by one slice).
closedByserver`{ kind: 'landing', viewId, channelMoveId, at }
createdBy, atserverActor from the hosted event, as today.

Initiatives are Items with kind: initiative and no parentId; they take title, body, order, status, reason, fields. Nested Initiatives are not created in v1 (existing nested records flatten under their first visible parent, as childInitiatives does today).

Comments stay as today (planningComments) plus one boolean, decision. Decision comments are the record of choices; they are never written by auto-tracking.

Grouping by any field

Group-by options are built from a fixed list plus the project's custom fields: Initiative (default), Type, Status (derived), Actor (last actor on a linked Lane), each custom field, None. Group order: Initiatives by their own order; field values alphabetically with an empty bucket last. Within a group, Items by order.

Shared, editable order

order is one shared list per sibling set. People reorder by drag or keyboard; agents reorder through plan move. Policy planning.reorder: people (default: people only), people+own (agents may move Items they created or are working on), all. Same shape as queue reordering (owner decision 2026-10-26: off by default for agents, own entries only).

2. Status from real events

Derived status is computed server-side from linked records and stored in a projection row per Item (planningStatus: { itemId, derived, flag?, laneCount, saveCount, lastSaveAt, checkState?, queuePosition?, landedAt?, updatedAt }), updated by the same hooks that write Lane, check, queue and landing records. No polling, no model prose.

Precedence (first match wins):

DerivedRulePill
Abandoneddeclared abandoned— Abandoned (grey)
Donedeclared closed, or closedBy.kind = landing✓ Done (green)
Conflicta linked Lane's latest sync or compose reports conflict⧉ Conflict (violet)
Check failedlatest check on a linked Lane's newest Candidate failed✕ Check failed (red)
Waitinga linked Lane or Intent has an unanswered question, overlap ack, or review for a person; or a decision comment addressed to a person is open◷ Waiting (amber)
Readya linked Candidate passed and is queued to land or awaits acceptance✓ Ready (green)
Checkinga check is queued or running on a linked Candidate◐ Checking (blue)
Workingany linked Lane is active with at least one save or edit● Working (blue)
DatednotBefore is in the future and nothing above applies○ Dated (grey)
Proposeddeclared proposed (from outside, not yet planned)○ Proposed (grey)
Plannedeverything elsePlanned (plain)

An Item with sub-items derives from them: Done when all sub-items are Done (or it is closed itself); otherwise the most urgent sub-item state by the same precedence; its progress reads "2 of 5".

Closing by landing: when a linked Lane's Candidate is accepted on main and lifecycle.completeOnAccept completes the Intent, the Item is closed with closedBy.kind = landing. If the Item has other linked Intents still open, it stays open and the fact line says "1 of 2 Intents landed". Reopening the Intent reopens the Item.

The Initiative one-liner is assembled from counts of its top-level Items, zero buckets omitted, in this fixed order:

<landed> of <total> landed · <working+checking> working · <ready> ready · <waiting> waiting on you · <failed+conflict> blocked · <dated> dated · <planned> planned

Examples: "0 of 9 landed · 2 working · 1 waiting on you · 3 dated · 3 planned". Closed Initiative: "14 of 14 landed · closed 25 Oct". Empty: "nothing planned yet". "waiting on you" is used when the viewer is the person; otherwise "waiting on <name>".

The project-level situation sentence on Planning uses the same template across Initiatives that are not quiet.

Per-Initiative daily buckets (planningDaily: { initiativeId, day, scope, landed, inFlight, waiting, blocked }) are appended once per day per Initiative on the first status change of that day and overwritten on later changes that day. They feed burn-up and flow with reads of O(days).

3. Default view and history

Alive (default) = Proposed, Planned, Dated, Working, Checking, Ready, Waiting, Check failed, Conflict, plus Items landed in the last 24 h (shown dimmed at the end of their group, then gone). Filters inside Alive: Waiting on you · Blocked · Dated. The search box on Alive filters alive Items only.

History = Done and Abandoned, newest close first, with search across titles, bodies, comments and close reasons; a scope toggle "Everything" includes alive Items. Export stays here.

Quiet Initiatives: an open Initiative with nothing in flight, nothing waiting on anyone and no event for 14 days (project setting) collapses into one line at the bottom of Alive: "14 quiet Initiatives · 46 planned · no activity since 16 Oct". Expand to see them. They still count in History search. This hides imported or abandoned-looking history without deleting it.

4. Quick capture, refine later

One input at the top of Planning and of every Initiative page: title only, Enter adds a Planned Item at the end of the current group (the Initiative in scope, or the one chosen in the small "in …" selector; remembered per project). ⌘Enter adds and opens. If the first word matches a type ("bug: …"), the type is set and shown as auto with Undo. Toast: "Added '…' to Release 2 · Undo · Open".

Refine is a set of ordinary actions on the Item page and the row menu: Edit, Split into sub-items, Merge into… (closes this Item with closedBy.merge, moves comments as quotes, links Intents to the target), Move to… (Initiative or parent), Set not before, Hand to an agent (copies a prompt with the Item id; the agent uses the CLI or MCP). Forge itself never calls a model.

5. Everything tied together

Item ↔ Intent ↔ Lanes ↔ checks ↔ landing. The Item page's Work panel shows the chain as records: Intent, each Lane with save count and state, the newest check with the journey rail, and the landing (commit, channel move, time). Start a Lane from the Item (start {itemId}) creates and links the first Intent and Lane; an agent that starts an Intent and names an Item links the same way; auto-tracking (below) covers the rest.

6. Auto-tracking setting

Settings › Project › Planning › Track work in planning:

  • Link work to Items (on by default). A Lane started without an Item gets one, titled from the Intent outcome, under the Initiative the agent passed (initiative on start) or none; the Item closes when the Lane lands, with evidence. Deterministic, server-side, no tokens. Off means Items are only created explicitly.
  • Agents write Item text (off by default). A policy flag read by the skill: when on, agents fill why / done-when on start and a two-line summary on close. Costs the agent's tokens.
  • Who can reorder: people · people and agents on their own Items · everyone.
  • Types, Fields (≤ 6), Quiet after N days.

7. Navigation

Work sub-nav: Intents · Lanes · Planning (unchanged). Planning has one view switcher: List · Board · History. Group header → Initiative page. Row → Item page. URL records view, filter, group-by and search; the browser remembers the view per project.

Views kept (design choice): List (default), Board (same five columns as Intents Board: Planned · Working · Checking · Ready · Done 7 days; Dated, Waiting, Failed and Conflict are flags on cards, not columns), Initiative page with Progress swimlanes + burn-up + flow, History. Not built: timeline/Gantt with dates, per-person boards, velocity, estimates, sprints, cost.