Roadmap
What we are doing, in what order, and why. Nine phases. Phases 1–6 are done (Phase 6 closed on 2026-11-16; see the close). Phase 7 is current: the product and design people see, Phase 8 is the public beta (onboarding, permissions and production), Phase 9 is growth (owner re-bucket, 2026-11-07). Open work items live in Forge planning (see the backlog page); what works today is in status. Keep this page current: update the status lines when a stage changes.
Last updated: 2026-11-16.
Direction
Forge's claim is that many agents can work on one codebase at once, aware of each other, with a human who can see and steer. Until that is proven against plain Git we prioritise: (1) never losing work, (2) landing speed, (3) live coordination, (4) a usable cockpit, (5) near-zero running cost, and we freeze new breadth. Forge builds itself: every change on this page lands through Forge's own workflow.
Product direction: an open source replacement for the GitHub workflow, cheap enough to host for many small projects, with a free core. Hosted Forge becomes the canonical home of a project; the owner's own machine stays a supported offline mode and Git stays an interchange format.
Phase 1: foundations (done)
Goal: a trustworthy base and a way to measure.
Delivered:
- Prettier on all TypeScript;
format:checkis part ofverify. - One standard in-repo check (
scripts/forge-check.mjs, Forge checkverify). - Accepted work is never lost: acceptance refuses stale Candidates;
finishsyncsmain; asyncaction; optional pins. - Docs and process reset (AGENTS.md, about a dozen docs instead of about ninety).
- A first cost model (summarised in status): reads and file egress dominate at scale; identity is free; storage at rest is minor.
- A multi-agent benchmark harness and a Git-worktree baseline, kept outside this repository. Four scenarios (related tasks, mid-task contract change, disconnect and recovery, human redirect) by three agent mixes by two repetitions.
Baseline result: plain Git with worktrees passed 24 of 24 pairs, median about 110 s per pair, with 3 conflicts and 2 rejected pushes all recovered by the agents. Those scenarios are too easy to show a coordination benefit, so Forge can at best tie on success and must win on time or tokens. Harder scenarios (3 to 5 agents, longer tasks, overlapping edits that text merge accepts but that break behaviour, a contract change only coordination reveals, a larger codebase) were added for the Forge arm.
Phase 2: make multi-agent work real (done)
Goal: the product behaves correctly with several agents at once, and a human can see it.
Delivered:
- Cockpit and UI rebuild: one screen answering who is working, what is changing, what is related and what needs a decision.
- Incremental Work metadata: source bytes, missing-object negotiation and binding validation reuse earlier checkpoints, and hosted source returns stage per-Candidate changed-path provenance.
- Native bound exchange pushes, the hosted index, presence, Lanes, Candidates, Checks and the acceptance ledger.
- The Forge arm of the benchmark harness.
Closed on 2026-10-16.
Phase 3: speed, trust and hosted groundwork (done)
Goal: make landing fast, make checks trustworthy and cheap, and lay the groundwork for hosted projects.
Delivered:
- Scope-aware checks, concurrent checkpoints, landing batches and remote runners. Landing measured 2–3× faster than the GitHub merge queue on the same runners. A full check took about 5–6 minutes on Blacksmith (historical: Blacksmith use ended on 2026-10-25). About 134 landings completed.
- Clean-environment checks, authorization fixes and runner qualification. The restore drill passed.
- Performance instrumentation, client error capture and cheaper idle tabs and source returns.
- Intent vocabulary, UI coherence, quickstart, glossary and agent docs.
- Hosted main, browser project creation and resumable lossless GitHub import.
Closed on 2026-10-20. Current measurements and capabilities are in status. Remaining work follows below and in Forge planning (see the backlog page).
Phase 4: we're happy using it (done)
Goal: the Forge team uses Forge end to end on its own project and is happy with it.
Started on 2026-10-21. Work in order:
- R3 metadata-only publication and return — done, except the big-backlog measurement. Routine push fell from 95 minutes to about 3 minutes; push #21 took 186 seconds. See the R2 storage plan.
- Carried-over fixes — done: P03, P04, P12, P15 and P27; hosted-unsynced state; incremental deploy export; retained runner cost estimates.
- Hosted Lanes — built (H01–H18b, H22a and H22b): start, save, compose, land, revert and abandon from the site with all Macs offline, through a server-side landing queue with compare-and-swap main. Checks ran on the project's own GitHub Actions or Blacksmith runners (since 2026-10-25, Blacksmith is not used). The H22b live smoke with a registered GitHub App moves into Phase 5 Bet 1, where the hosted path becomes the only accept path.
- The lead's routine in the product — done:
nforge landbatch landing with--waitprogress, the landing train (S01–S17), automatic exchange, the release command and GitHub sync. - Off-machine recovery — done: inventory, restore and reconnect, and weekly backups. The recovery drill passed on 2026-10-24 (recover in 9 seconds; see the recovery drill).
- Predictive overlap warnings — done: overlap alerts on save, and overlap-aware landing order.
- CI speed — added 2026-10-23: native TypeScript (typecheck 76 s → 34 s), timing-balanced shards, smarter test selection, fake timers in the slowest tests, reuse of a passed check, oxlint and oxfmt, and a landing that never stalls on one lost run.
- Closure fixes — added 2026-10-24: automatic Lane snapshots after file changes, read-only commands that never write, no-op landings that finish themselves without empty GitHub commits.
Moved to Phase 5: the agent-coordination benchmark (forge-bench R3), which now runs after overlap at first write exists (Bet 3), and the big-backlog push measurement.
Closed on 2026-10-25. Experiments E1 and E3 are published in why-forge: overlap alerts now reach every overlapping pair at save time, but not always before the next save; with one failing change, a tuned GitHub merge queue landed about 5.2× faster. Both feed Phase 5. Closing also fixed two idle Convex cost leaks: a sync drainer that retried a failing publish, and a project-delete purge that rescheduled itself forever.
Phase 5: one authority, three bets, then private alpha (done)
Goal: Forge runs itself for the Forge team, with numbers to show it, before outside users arrive. The full plan with slices, acceptance criteria, metrics and the stage-by-stage critical path is in the Phase 5 plan, which marks each row done, partial or not started. Reads that never write and automatic Lane snapshots are Phase 4 prerequisites. Phase 5 ran from 2026-10-25 to 2026-11-04.
Both owner-set exit criteria are met (owner decision, 2026-10-31): the benchmark is published (exit criterion 2: E1–E3 and R3, with the Forge-versus-GitHub benchmark on a real repository, B1.5d, which carries R3 as its coordination section), and an import works with no Mac in 5 minutes or less (exit criterion 5: 2 min 31 s and 2 min 37 s in two runs, until the project is agent-writable on t3code). See the public close. Phase 5 closed on 2026-11-04; open work was moved to named Phase 6 and Phase 7 stages.
Where each item stands:
- Stage 5.1: self-metrics and decision records — done. Forge records its own numbers (landings by path, interventions, check minutes and reuse, bills) and owner decisions are records. Several metric rows are still partly unknown; the baseline table in the plan is the Phase 5 start, not today's values.
- Bet 1: one authority — cutover applied; retired runtime removed. Hosted main is the only accept path for the dogfood project. The Mac no longer accepts, runs checks or pushes; checks run on free GitHub-hosted runners. The push, source-return, relay, format-ladder, reconcile and legacy-accept code is deleted (B1.6–B1.8). The six retired dev tables are purged, and the local owner HTTP server, native-owner recovery/reconnect and supervised owner release selection are removed (B1.9). The local pre-cutover snapshot awaits owner-approved deletion after landing. A GitHub import is now fast enough (criterion 5 above).
- R2 for bytes — done for new bytes. Owner decision 2026-10-31: R2 is required everywhere. The per-project opt-in and the
FORGE_BLOBSflag are gone, every deployment and project writes bytes to R2, and a guard innpm run verifyfails any new Convex file-storage use (data placement). Still to do: move and delete the legacy Convex copies (Issue 40dad5e0), each step with an owner decision. - Landing without an operator — done. A server controller drives landings, entries finish themselves, a stall alarm exists, and check reuse is keyed on content. On 2026-10-31 two entries were found queued for about a day after their stall alarm fired. In the current code a queued entry that nothing live is driving is re-driven and, failing that, ended after 60 minutes as
terminal-failedwith a stated reason, and stall alerts by email or webhook are on by default. Whether an alert reaches a human depends on the recipients and webhook configured for the deployment; that is not recorded here (Issue 7e38bf5e). - Bet 2: contract checks — mostly done. The contract gate has been on for the dogfood project since 2026-10-30; the continuous main audit, flake classification and culprit bisection are live; batch demotion (B2.5) has landed, but its acceptance (trusted landings pass without a batch) is not yet evidenced. Trust per path per actor (B2.6) has landed disabled and waits for the owner to approve defaults.
- Experiments. E1 and E3 are published in why-forge. E2 was replaced by B1.5d, whose real-agent results are published in b15d-report (2026-11-04): Forge's time to main per task is 24-35% faster than GitHub at every N with equal correctness and about a third of the CI minutes; whole-batch wall time is a clear win only at N = 1. The R3 re-measure (B3.5) runs inside B1.5d (owner, 2026-11-01). The gate-time and cost figures (G8) are not started. Nothing is published to npm or prod and no outside user is invited until the owner decides.
- Bet 3: coordination that bites — mostly done. Overlap at first write, semantic conflicts and overlaps in Now have landed. An overlap-delivery fix landed on 2026-10-30; before it, no overlap notice was delivered that day. Declaration-level merge (B3.4) waits until at least 20 cases exist.
- Vocabulary.
start,saveandlandlanded with operator verbs undernforge x. Alias removal and the CLI generated from the MCP surface (V2b, V3) move to Phase 6.
Unfrozen on 2026-10-31 (the freeze condition, E1 and E3 published and the cutover landed, has held since 2026-10-28): the failed-file report (G5), flake containment (G4), two-way GitHub sync (H23, H24), and the landing timeline, CI insights and hosted Lane rows (H19b–H21), which fold into the Now view. Still frozen: anchored comments, which need declaration identity from B3.4. Dropped: browser code editing (H19a), and CI adapters for Azure DevOps and GitLab (GitHub Actions only for the beta; revisit on outside-user demand). The per-machine check cache (G7) is superseded by the packs work, and gate time and the E3 rematch (G8) are carried as planning Issues.
After the bets: a trial with outside users, a polished first project through GitHub import, and newcomer docs. Not started.
Phase 6: make it solid (done)
Closed on 2026-11-16. The close records delivery, each exit criterion and owner disposition, the final serving-cost reference and the idle capture. The plan summarizes the completed stages; detailed evidence stays on the Forge Issues.
Delivered hosted conflict/finish recovery, shared checks and overtakes, verified State/recipe source preparation, R2 placement and cold-history reductions, a consolidated agent surface and mechanical regression guards. The exit bench and cross-repository suite retain all results and misses. The owner accepted the bench with caveats and accepted going to market at the measured serving cost on 15 November: Professional $1.682603/1,000 with calls/compute inside included use, $4.201304/1,000 full list. Storage and weekly backup maintenance remain unmeasured; this is not an all-in price.
Every preceding P6 Issue is closed or abandoned. The carried-work table names the owner-approved Phase 7 follow-ups, including the source-only sync gap, source-action diagnostics, flakes, workflow/import/preflight papercuts, regression ladder and close validation. No literal all-gates-passed or universal Forge-over-Git speed claim follows from phase close.
Phase 7: product and design (current)
Goal: the product people see is fast, coherent and designed; the site is redone from scratch with Fable art direction. The Phase 7 plan gives the stages (A spikes and guards, B shared base, C fan-out, D close) and their Items. Start from Phase 7 Initiative 28591eeb-b74b-413a-ac41-1fef018b3dc1 and its current build-index comment; the Phase 6 close names the carried verification and implementation work.
Exit: the redesigned site and product views ship on dev, the marketing story is ready for the Phase 8 beta, and nothing is published that the owner has not approved.
- 7.1 Product people see: a design pass (fast highlighted diffs, Lane change speed, onboarding and project navigation), planning for agents and humans (design pack: planning), the Now view, a dependency graph, the web board view, Initiative progress and rich discussions with Markdown and images.
- 7.2 Moved from Phase 6 (owner, 2026-11-07): Lane undo, a failure log and on-demand health report, landing discipline as shipped defaults (skills, MCP, settings) and symbol-level overlap notices.
- 7.3 Story: the hero and story, a visual signature, design tooling and LLM discoverability (
llms.txt). - Landing page redesign (tentative): the 2026-10-27 landing-page-skill trial (study; outside references) produced a mockup with on-page proof, how it works, a FAQ, a final call to action and corrected title, description and repository links. Accept it as a tentative direction only. Before the public beta, assess critically whether it is better overall than today's page, and make the page striking, not only complete. Aim for something unique to Forge rather than a template: the owner's style references are daoho.dev, whose strength is one living element tied to its metaphor, an editorial type voice and restraint, and nusretuzman.com, with a personal voice, a simple stacked layout and work shown as real product screens rather than described. Find Forge's own signature (for example Lanes flowing into
main), animated on the client only, paused when hidden and never costing Convex calls. KeepDESIGN.mdas the visual authority and never invent testimonials or logos.
Phase 8: public beta (planned)
Goal: Forge live as a beta on a proper domain and on production, usable by a stranger with only the setup link.
Exit: Forge runs as a beta on its own domain, on production; onboarding works for a stranger with only the setup link; sharing, permissions and trust and safety are in place; nothing is published that the owner has not approved.
- 8.1 Fresh-user path and GitHub: install prerequisites stated plainly, an agent-followable setup page, no background process for normal users, GitHub import, two-way GitHub sync, CLI release channels and the CLI as a package (owner-gated).
- 8.2 Production, domain and the move of Forge itself: production setup with a spend limit first, the domain, then moving Forge's own project from Convex dev and R2 dev to production (dry run on a copy, a rollback point, idle at 0 after, and a billed-cost check). Forge's repository becomes a public project on Forge from then on. Every secret is rotated at the move; protected
main; an internal cost view.- If the move uses Convex data that predates the actor display-name purge, run the purge before deploying the schema that drops the field. Use the compatible migration from Forge State
80027c85: startprojectActorNames:purgeDisplayNameswith a null cursor, follow each returned cursor untilisDone, then check that a full second pass deletes and clears zero rows. Rehearse this on the dry-run copy before the owner-approved production move.
- If the move uses Convex data that predates the actor display-name purge, run the purge before deploying the schema that drops the field. Use the compatible migration from Forge State
- 8.3 Sharing and permissions: project visibility (private, public read), members and roles, invites by link or GitHub account, what agents may do with each role, hosted versions of the agent commands, and public reads served from R2 through the edge cache. GitHub norms: frictionless but secure.
- 8.4 Launch: the gate-time and cost figures (G8), a real-user scenario matrix, and inviting people when the owner decides who and when.
Streaming source steps (P8)
Issue c3add134-5583-4d45-8af6-98704b9aab84 owns the shared streaming State
reader/writer and all four source phases before outside users. Read the Issue and
its current acceptance lines with
nforge agent ROOT planning '{"id":"c3add134-5583-4d45-8af6-98704b9aab84"}'.
It must retain byte-identical States, flat R2 requests/bytes and Convex calls,
zero idle work, and acceptable wall time at 4k/29k while every phase stays below
512 MiB with margin at 190k files. It then relaxes or removes the
temporary repository envelope.
See the measured spike and streaming prototype.
Phase 9: grow (planned)
Moves up only if the public beta needs it: open-source mode (proposal limits, anonymous visibility, an optional CLA), monetisation with a free core (any limit or price needs an owner decision), cross-repo coordination with shared usage pools, deploy after landing, per-path visibility, bring-your-own CI, the making-of view, a compute pool view and an extension framework.
Workflow friction
-
An unchanged hosted Lane passed seven exact landing checks but remained unaccepted because concurrent
mainupdates superseded each checked Candidate. The helper reached its 90-minute wait limit and required an exact-operation replay. Preserve landing progress under concurrent updates and expose queue, recomposition and settlement timing so builders can distinguish churn from a failed check. -
The hosted Lane helper sends
testsalaneId, but the hosted command requires acandidateId; impact selection returnsBAD_ARGUMENTbefore selecting tests. Keep the helper and hosted contract aligned so builders can run the affected suite before finishing. -
The hosted builder helper hides a completed start receipt while materializing a Lane, then opens the same Lane into a second full checkout. A builder recovered its exact operation journal and moved the completed first checkout to the helper's expected path after stopping the redundant copy. Return the durable Lane ID and reuse its first checkout instead of materializing the tree twice.
-
The builder helper sends
tests {laneId}to a hosted command schema that acceptscandidateId, producingBAD_ARGUMENTbefore test selection. Keep the helper and advertised hosted command fields aligned; local dependency analysis and the full landing check currently supply that missing validation selection. -
The Phase 5
lane.sh tests LANE_IDhelper sends a Lane selection to a hostedtestscommand that now requirescandidateId; it returnsBAD_ARGUMENTbefore selecting tests. Keep the helper aligned with the current Candidate-based contract. The hostedpreflightverb now gives a local impact path for a saved Lane head;testsitself still takes acandidateId. -
Lifecycle mutations can commit their Lane head long before the CLI returns its advisory peer receipt. During writer contention, check the canonical saved head before replaying the same operation; expose durable mutation completion before expensive advisory hydration so builders can distinguish a committed save from a queued one.
-
A concurrent
startreserved an active Lane before returning its receipt, then spent several minutes waiting and preparing advisory output. Recovery required reading the retained start operation fromrecords. Emit the durable Lane ID and path before optional peer analysis so a builder can safely use its own Lane without retrying or guessing among other builders' new directories. -
Agent
startcan activate a Lane but hang before returning its receipt. Recovering the exact Lane requires manual discovery; return the durable activation receipt promptly. -
Overlap incident replays can interrupt a check with only
CHECK_RECOVERY_FAILED, hiding the controller startup error. Diagnosing it currently requires instrumenting a generated build. -
Repeating sync on a Lane with a pending merge returns
MERGE_PENDINGwithout listing its conflicting paths. Include the pending sync target and conflicting paths in that diagnostic so a merge agent can resume from the receipt. -
Core finish/publication edits select 217 of 349 test files, including hosted and UI suites. Finite implementation agents need a phase-focused validation selection alongside the conservative landing selection; the broad local run competes with concurrent Lanes for check capacity and disk writes.
-
A launchd
.plisttemplate selects the full test suite as an unclassified path. Finite agents forbidden from full verification must use affected backup/signer tests instead; the selector needs explicit template ownership. -
The weekly backup launchd template selects the full test suite as an unclassified
.plistpath, including when R7 consumes that prerequisite. Add a scoped mapping for backup orchestration/adapter tests so finite agents can run the returned selection without a forbidden full-suite run. -
Central agent lifecycle edits produce a broad local scoped selection: predictive-overlap work selected 210 files, and a two-worker run was interrupted after 49.5 minutes with unrelated synthetic Git setup timeouts. Actions dispatch edits likewise select over 220 files through Work's transitive importers; finite local validation needs the Actions and affected replay suites and must report the other selected files as unrun. Local task validation needs a focused selection distinct from the combined remote landing selection; it must retain coverage and report any unrun files rather than silently treating the broad selection as passed.
-
Browser byte work touching one Convex endpoint selects the whole backend namespace and shared native parser consumers (311 test files). This scoped selection is nearly a full suite for a finite implementation Lane. Expose narrower endpoint dependencies while retaining broad combined landing validation.
-
agent testscompares a saved Lane against the latest main. Concurrent accepted additions can appear as deletions in an unsynced Lane and force a full-suite fallback for unrelated work. Expose a pinned comparison for task-scoped validation without requiring a sync; the existing comparison remains useful for landing validation.
Related documents
- Backlog: points to Forge planning, where open work lives.
- R2 storage plan: why and how bulk bytes leave the database.
- Status: what works today.
- Design constraints, architecture, operations.
- Landing batches, GitHub Actions checks, runner fallback, hosted durability.