ForgeDocs

Flow Spec 02: Hand a planned Item to an agent

Goal: A person wants an agent to start work on a planned Item without writing a prompt by hand. They have chosen the Item from the backlog. Covers: R4, R27


Entry Points

  • From an Item: they open a Planned Item and choose Hand to an agent.
  • From Plan: a row's menu holds Hand to an agent.
  • From Loose ends: a stopped Lane offers its resume prompt (the same sheet, resume form).

The Flow

Step 1: Choose to hand it over

What they want: To give this Item to an agent now.

What they see: The Item: its title, its Done-when lines, its Initiative, and Hand to an agent as the primary action.

What they do: Choose Hand to an agent.

What happens: A sheet opens with a prepared prompt built from the Item.

Step 2: Check the prompt

What they want: To be sure the agent will get the right task and nothing more.

What they see: The prompt in short form: the Item id and title, the one command that starts the Lane, the Done-when lines, and a line that tells the agent where to read the rest. The full prompt text is one disclosure away. A field for one added note that is kept on the Item.

What they do: Optionally add a note.

What happens: The note is added to the prompt and saved on the Item's thread.

Step 3: Copy it

What they want: To paste it into their agent app.

What they see: A copy key, and the connected agent apps with the one command for each when an app is not yet connected (see Flow Spec 16).

What they do: Copy the prompt and paste it into their agent app.

What happens: The key confirms the copy. The Item shows "Handed over, not started" with the time.

Step 4: See it picked up

What they want: To know the agent took it.

What they see: On the Item and on Plan, the state changes to In progress when the agent's first start opens a Lane on it, with the session name and app that holds the Lane.

What they do: Nothing; or open the Lane.

What happens: The Item links to its Lane. Activity records who started it.

Step 5: Notice when it is not picked up

What they want: To know if the hand-over went nowhere.

What they see: If no Lane starts, the Item keeps "Handed over, not started" with its age; after a while it moves to Loose ends with a next step.

What they do: Copy the prompt again or hand it to another agent.

What happens: A new copy is recorded; no Lane is created by Forge.


Edge Cases

ScenarioWhat the user sees
The Item is ProposedHand to an agent offers to plan it first (one press), then the sheet opens.
The Item already has an open LaneThe sheet offers the Lane's resume prompt instead, naming who holds it.
The copy failed (browser refused clipboard)The prompt text is selected in place with an instruction to copy it by hand.
The prompt is still being preparedThe sheet holds space for it and reads that it is preparing; the copy key waits.
The Item has no Done-when linesThe prompt says so and asks the agent to propose them first.
First time: no agent app connected yetThe sheet shows the connect step for each app before the copy key.

UX Notes

  • Forge never starts an agent. Every word on the sheet says "copy" and "paste", never "send" or "run".
  • The prompt is short enough that an agent keeps it; detail is fetched by the agent when needed.
  • (Pending Decision — journey 25 question 3: assigning an Item to a named agent or person before any Lane exists.)

Prototype Scope

  • The Item with Hand to an agent.
  • The hand-over sheet with the short prompt, the full-prompt disclosure and the note field.
  • The Item in "Handed over, not started" and then In progress with its holder.
  • The sheet's resume form for an Item with an open Lane.
  • The clipboard-refused state.